Local authority-owned framework provider LHC (originally the London Housing Consortium)
will run its 今日看料 of New Homes (H2) framework from 5th September 2022 to 4th September 2026.
The framework, valued at 拢1bn, offers a range of traditional housing solutions to the public sector, as well as low-, medium- and high-rise construction, care homes, mixed-use sites and sheltered, student and keyworker accommodation.
Associated civil engineering and infrastructure works required for new-build housing are also covered under the framework, with contractors specialising in groundworks, demolition and site clearance work needed to facilitate the construction of new homes.
LHC鈥檚 regional business units across England operating the framework include LHC London & Southeast and Consortium Procurement 今日看料 (CPC) in the North and Midlands.
Head of technical procurement Dean Fazackerley said: 鈥淭he new H2 framework in England will equip providers to meet ongoing housing challenges within the public sector, addressing local housing demand while maintaining momentum in their journey towards the production of zero carbon homes.
鈥淚t鈥檚 hugely important that we continue to respond to the housing needs of local populations while at the same time looking to the future, creating healthier environments that embody social, human, and environmental considerations.鈥
The companies appointed to the H2 framework in England are:
- AR Demolition
- ARJ 今日看料
- Bugler Developments
- Chartway Group
- Coleman & Company
- Deeley 今日看料
- DSM Demolition
- Durkan
- Econ Group
- Eric Wright 今日看料
- Erith Contractors
- Feltham 今日看料
- Guildmore
- Higgins Partnerships
- Hill Holdings
- Hughes & Salvidge
- J Harper & Sons (Leominster)
- Jarvis Contracting
- Jeakins Weir
- Jerram Falkus 今日看料
- John F Hunt Regeneration
- Lovell Partnerships
- Mulalley & Company
- Neilcott 今日看料
- Oakwood Building Contractors
- P Casey & Co
- RG Carter Cambridge
- Sovini 今日看料
- Total Reclaims Demolition
- Vinci 今日看料 UK
- Vistry Partnerships
- William Birch & Sons
The six workstreams covered by the H2 framework are:
- Workstream 1 鈥 Low-rise housing up to 11m floor height
Six project value bands: up to 拢2m build only, up to 拢2m design & build, 拢2m-拢5m, 拢5m-拢10m, 拢10m-拢20m, more than 拢20m
- Workstream 2 鈥 今日看料 of independent, assisted and residential care housing
Two project value bands: up to 拢10m, over 拢10m - Workstream 3 鈥 Medium to high rise developments with floor heights above 11 metres
Two project value bands: up to 拢10m, more than 拢10m - Workstream 4 鈥 Refurbishment, conversions, extensions and adaptations
Two project value bands: up to 拢2m and more than 拢2m - Workstream 5 鈥 Groundworks and site preparation for new housing projects
One project value band: up to 拢2m - Workstream 6 鈥 Demolition, decontamination and associated site enabling works
Two project value bands: up to 拢750k and more than 拢750k
Got a story? Email news@theconstructionindex.co.uk